// CASE STUDY · 2024

Construction firm (NDA)

Construction ERP

ERP for a construction firm running concurrent sites. Asset tracking, task management, role-based access, real-time dashboard. Replaces the WhatsApp group nobody read.

Construction ERP — screenshot
// THE BRIEF

A firm running multiple sites at once, with tooling that was a mix of spreadsheets and a WhatsApp group nobody read past midday. They knew which equipment they owned. Not where it was today.

// WHAT I SHIPPED

Asset tracking (which excavator is on which site, who has it, when it's free), task boards with dependencies and assignments, role-based access, real-time admin dashboard. React + Redux Toolkit + Vite, Ant Design for the dense table-and-form chrome.

// THE DETAIL WORTH TELLING

The dashboard was the thing the partners actually used. It boils project oversight down to one screen that answers "is this site on track" without three managers phoning each other to check.

// STACK
  • React
  • TypeScript
  • Redux Toolkit
  • Vite
  • Tailwind
  • Ant Design
// CONTACT · 連絡

Drop a line.

Quick brief is fine. I read everything.

or email kelvin@kyzenlabs.com